Existing Folly Bridge structure - prior to works starting on site. (at track level) Existing Folly Bridge structure - prior to works starting on site (footpath level). Site Compound area in the local Quarry - next to the Motorcycle track. Local Motor Cycle track - Proposed access at DB Schenkers Yard - Ian Bluff and Mathew Howard looking at the access. View from Folly Bridge looking back up the track to the pedestrian access next to the road bridge. Folly Bridge deck end being opened up ready for bridge removal. Existing structure deck end being opened up ready for removal.. RRV Trailer being loaded on to the track at DB Schenkers Yard. Giga Rail Crane lifting down the concrete deck units - and excavated material - in bulk bags. Giga Rail crane lifting down the structure - note that the rail crane doesn't use any outriggers it lifts from the rails. New Structure installed - 4nr pre-cast concrete beams set in place. Scaffolding erected on all four corners. New Structure installed - with GRP posts and rails installed . Waterproofing being installed to the bridge deck. Diamond Drilling underway to the abutment face for the drainage pipework. Drainage channels being installed on the deck. View of the new structure from track level - abutment still requires jet washed. View on the bridge showing back face of the GRP. Bridge deck - black topped. Page under construction...